here to ev1 that needs the help to pass a level
😵Monster Garage
level 1
Rock Crawler
Parts(BUY)
4 Monster tires
2 Sparco racing seats
1 Heavy duty rear axle
1 Safety fuel cell
1 Heavy duty front axle
4 Heavy Duty 40"coil over
Raw(BUY)
2 Steel tubes (IRL would take about 10)
Build
1 Steel tube to make front suspension frame
1 Steel tube to make roll cage
Perform
Hit lift button, remove tires. Steel should be in stock, click on dudes have them make front suspension and rool cage. Then remove front and rear axles, shocks. Remove hood, grill, bumper, L&R fenders, drag fenders and grill to dudes to mod. attempt to open rear door, cutoff, then dump tail gate to guy to mod. REMOVE ALL GLASS, remove roof have dude once again mod. (optional) Remove L&R rear quarters and have them mod em. Remove rear floor (not needed in reassmebly) Cut front engine clip off (not needed)
Weld in front suspension frame (one dude made). Install roll cage (weld in place) Install 40" blue coil over shocks, axles, fuel cell. As dudes get done mod quarters (all 4 weld in place) weld in rear moded rear tailgate and front grill. install 2 seats, doors. Weld in roof. Should see a message saying good job. Move on to day 7
Good luck!!
Level 2
Snowmobile
Careful while clicking rapidly through the menu for the parts to be made. I received lots of Critical errors and crashes, so you may want to save your progress after each part completion.
parts(You Need, Dont buy all, not enough $$)
1 Left ski
1 Right Ski
2 Snowtracks
2 engines
2 Steel chains
2 Sprokets
4 Short hydralics
2 Brake Disc+Calipers
2 Brake Levers
Makeable Crap (breakdown)
Drivetrain Left Track 8 hours
1 40"Steel tube
1 Brake Disc+Caliper
1 Sporket
1 Steel Chain
Drivetrain Right Track 8 hours
1 40"Steel Tube
1 Brake Disc+Caliper
1 Sporket
1 Steel Chain
Hector Stick 30 mins
1 40"Steel Tube
1 20x20 Inch Sheet Metal
2 Brake Levers
Roll Cage 11 hours
3 120 Inch Steel Tube
Track Frame 6 hours
1 120 Inch Steel Tube
30 Aluminum Wheels
6 80 Inch Angle Iron
L & R Track frame Suspension
4 Short Hydralics
1 40 Inch Angle Iron
Mounting Frame For Engines
3 80 Inch Angle iron
BUY(PARTS)
2 Snowtracks
1 Master Cyliners
2 Engines
2 steel Chains
2 Sprokets
4 Short Hydralics
2 Brake Disc+Calipers
2 Brake Levers
Buy(RAW)
3 40 Inch Tube
4 120 Inch Tube
1 20x20 Inch Sheet metal
3 Aluminum Cylinders
Have dude make Roll Cage, 11 hours to make? He should be ashamed of himself! Would take Joe TooThless mechniX about an hour.
Open door, remove front seats. By this time steel and aluminum will be in parts bin.
Drag and drop Aluminum blocks to dudes to make wheels.
Remove rear seat, door panels, Interior carpeting. Open tailgate remove liner on inside (look under tailgate black plastic liner)
Sell
passanger seat, rear seat, carpeting, L & R door panels and tailgate liner
Now you have some cash to go after the remaining crap you need.
Buy
Left Ski
Right Ski,
1 40 Inch Angle Iron
9 80 Inch angle iron
Remove
Rear Bumper, cut trunk area out.
Have dude make Track Frame, L & R Track Frame Suspension
Bolt in Roll Cage
Have dudes make L & R Drivetrains (2 seperate guys).
Weld in both Track Frame Suspensions.
Have dude make hector Stick.
Have dude make mounting frame for engines.
Install
L & R Front Skis and master cylinders.
By this time Hector Stick should be done, install that.
Install Track Frame, click on snowtracks and they install like magic.
Install Engine Frame, L & R Drivetrains, Engines. Replace Rear Bumper and Drivers Seat and you should see Great Progress. Move on to day 7 cutomize that ride.
Test
Hit TAB to drop tracks and off you go! 3 checkpoints
GoodLuck!!